Sign In
Upload
Manuals
Brands
Allied Telesis Manuals
Switch
AT-SBx908
Allied Telesis AT-SBx908 Manuals
Manuals and User Guides for Allied Telesis AT-SBx908. We have
1
Allied Telesis AT-SBx908 manual available for free PDF download: Installation Manual
Allied Telesis AT-SBx908 Installation Manual (218 pages)
Brand:
Allied Telesis
| Category:
Switch
| Size: 6.68 MB
Table of Contents
Table of Contents
5
Preface
15
Document Conventions
16
Contacting Allied Telesis
17
Chapter 1: Overview
19
Overview
20
AT-Sbx908 GEN2 Chassis
20
Ethernet Line Cards
20
Management Software and Interfaces
20
Management Methods
21
Management Panel
21
Power Supplies
21
AT-Sbx908 GEN2 Chassis
22
Figure 1: Front Panel of the AT-Sbx908 GEN2 Chassis
22
Figure 2: Rear Panel of the AT-Sbx908 GEN2 Chassis
22
Ethernet Line Cards
23
Figure 3: AT-Sbx908 GEN2 Ethernet Line Cards
23
AT-XEM2-12XT Line Card
24
Table 1: Twisted Pair Ports on the AT-XEM2-12XT Line Card
24
Table 2: Link and Activity Leds on the AT-XEM2-12XT Line Card
24
AT-XEM2-12XS Line Card
26
Table 3: Link and Activity Leds on the AT-XEM2-12XS Line Card
26
AT-XEM2-4QS Line Card
27
Table 4: Link and Activity Status Leds for the AT-XEM2-4QS Line Card
27
AT-XEM2-1CQ Line Card
28
Table 5: Link and Activity Status LED for the AT-XEM2-1CQ Line Card
28
Management Panel
29
USB Port
29
Figure 4: Management Panel
29
NET MGMT Ethernet Management Port
30
Table 6: Twisted Pair Cable for the NET MGMT Port on the Management Panel
30
Console (RS-232) Port
31
Switch ID LED
31
Table 7: NET MGMT Port LED
31
Eco-Friendly Button
32
Reset Button
32
Figure 5: Switch ID LED
32
Power Supplies
34
Figure 6: AT-Sbxpwrsys2 and AT-Sbxpwrsys1-80 Power Supplies
34
AT-FAN08 Units
36
Figure 7: AT-FAN08 Module
36
Specifying Ports in the Command Line Interface
37
Figure 8: PORT Parameter in the Command Line Interface
37
Table 8: PORT Parameter Format
37
Software and Hardware Releases
39
Table 9: Software and Hardware Releases
39
Chapter 2: Virtual Chassis Stacking
41
Overview
42
Stacking Guidelines
43
Stack Trunk
44
Figure 9: Example Trunks for Stacks of Two, Three, or Four Switches
45
Figure 10: Stack of Three Switches with a Linear Trunk
46
Figure 11: Example of a Trunk with Multiple Links between Switches
47
Figure 12: Example of a Stack Trunk of Ports on Multiple Line Cards
48
Figure 13: Invalid Trunk with too Many Stacking Ports
49
Table 10: Maximum Number of Trunk Ports Per Switch
49
Figure 14: Stack with Three Chassis
50
Figure 15: Invalid Trunk Because Switches Have Different Numbers of Trunk Links
51
Figure 16: Invalid Trunk with Different Ethernet Line Card Models
52
Figure 17: Invalid Trunk Using both Direct Connect and Fiber Optic Cables on AT-XEM2-12XT Line Cards
53
Figure 18: Invalid Trunk Using both Direct Connect and Fiber Optic Cables on AT-XEM2-4QS Line Cards
54
Figure 19: Example of a Stack Trunk with AT-XEM2-1CQ Line Cards
55
Figure 20: Invalid Trunk Because a Chassis Is Connected to Three Other Chassis
56
Figure 21: Invalid Trunk Because of Intermediary Network Devices
57
Master and Member Switches
58
Selection of the Master Switch
58
Switch ID Numbers
59
Optional Feature Licenses
60
Planning the Stack
61
Stacking Worksheet
62
Table 11: Stacking Worksheet
62
Table 12: Stacking Worksheet Columns
62
Chapter 3: Beginning the Installation
65
Hardware Installation Overview
66
Table 13: Hardware Installation Procedures
66
Reviewing Safety Precautions
68
Choosing a Site for the Chassis
73
Figure 22: NEMA 5-20P Plug and Receptacle
73
Unpacking the Chassis
74
Figure 23: AT-Sbx908 Gen2 Switch Shipping Box
74
Figure 24: Lifting the Switch from the Shipping Box
75
Figure 25: Removing the Switch from the Protective Shipping Bag
75
Figure 26: Pre-Installed Items on the Front and Side Panels
76
Figure 27: Pre-Installed Items on the Rear Panel
77
Figure 28: Accessory Kit
78
Unpacking AT-Sbxpwrsys2 AC Power Supplies
79
Figure 29: Items in the Shipping Box for the AT-Sbxpwrsys2 AC Power Supply
79
Unpacking AT-Sbxpwrsys1-80 DC Power Supplies
80
Figure 30: Items in the Shipping Box for the AT-Sbxpwrsys1-80 DC Power Supply
80
Chapter 4: Installing the Chassis
81
Tools and Material
82
Adjusting the Equipment Rack Brackets
83
Figure 31: Chassis Orientations in the Equipment Rack
83
Figure 32: Chassis Orientations in the Equipment Rack (Continued)
84
Figure 33: Chassis Orientations in the Equipment Rack (Continued)
85
Figure 34: Example of Adjusting the Equipment Rack Brackets
86
Installing the Chassis in an Equipment Rack
87
Figure 35: Securing the Chassis to the Equipment Rack
87
Installing the Chassis Grounding Wire
88
Figure 36: Stripping the Grounding Wire
88
Figure 37: Removing the Grounding Lug from the Chassis
89
Figure 38: Attaching the Grounding Wire to the Grounding Lug
89
Figure 39: Installing the Grounding Lug and Wire
90
Installing AT-Sbxpwrsys2 AC Power Supplies
91
Figure 40: Removing the Blank Power Supply Panel from Power Supply Slot B
92
Figure 41: Lifting the Locking Handle on the AT-Sbxpwrsys2 Power Supply
92
Figure 42: Sliding the AT-Sbxpwrsys2 AC Power Supply into the Chassis
93
Figure 43: Lowering the Locking Handle on the AT-Sbxpwrsys2 AC Power Supply
93
Installing AT-Sbxpwrsys1-80 DC Power Supplies
95
Figure 44: On/Off Switch on the AT-Sbxpwrsys1-80 DC Power Supply
96
Figure 45: Loosening the Handle Locking Screw on the AT-Sbxpwrsys1-80 DC Power Supply
96
Figure 46: Lifting the Locking Handle on the AT-Sbxpwrsys1-80 DC Power Supply
97
Figure 47: Inserting the AT-Sbxpwrsys1-80 DC Power Supply
97
Figure 48: Lowering the Locking Handle on the AT-Sbxpwrsys1-80 DC Power Supply
98
Installing Ethernet Line Cards
99
Figure 49: Removing a Blank Line Card Cover
99
Figure 50: Removing the Ethernet Line Card from the Anti-Static Bag
100
Figure 51: Sliding the Ethernet Line Card into the Slot
101
Figure 52: Seating an Ethernet Line Card in the Chassis
102
Figure 53: Tightening the Two Captive Screws on the Ethernet Line Card
102
Installing Blank Line Card Slot Covers
103
Figure 54: Installing a Blank Slot Cover
103
Figure 55: Tightening the Captive Screws on a Blank Slot Cover
104
Installing the Blank Power Supply Slot Cover
105
Figure 56: Lifting the Locking Handle on the Blank Power Supply Slot Cover
105
Figure 57: Aligning the Blank Power Supply Cover in the Slot
106
Figure 58: Lowering the Locking Handle on the Blank Power Supply Slot Cover
106
Installing the Power Cord Retaining Clips
107
Figure 59: Installing the Power Cord Retaining Clips
107
Verifying the Installation
108
Chapter 5: Wiring the AT-Sbxpwrsys1-80 DC Power Supply
109
Introduction
110
Figure 60: Components on the AT-Sbxpwrsys1-80 DC Power Supply
111
Choosing a Method for Attaching the Grounding Wire
112
Figure 61: Grounding Wire Terminal
112
Connecting the Grounding Wire with the Grounding Terminal
113
Figure 62: Stripping the Stranded Grounding Wire
113
Figure 63: Attaching the Stranded Grounding Wire to the Grounding Terminal
113
Figure 64: On/Off Switch on the AT-Sbxpwrsys1-80 DC Power Supply
114
Figure 65: Removing the Nut and Washer from the Grounding Post
115
Figure 66: Attaching the Grounding Lug and Wire to the Grounding Post
116
Figure 67: Securing the Grounding Wire
117
Connecting the Grounding Wire with Bare Wire
118
Figure 68: Stripping the Solid or Stranded Grounding Wire
118
Figure 69: Attaching the Bare Grounding Wire to the Grounding Post
119
Figure 70: Securing the Bare Grounding Wire to the Grounding Post
120
Introduction to Attaching the Power Wires
121
Figure 71: Power Wire Terminals
121
Connecting the DC Power Wires with the Straight Terminals" on
121
Connecting the DC Power Wires with the Straight Terminals
122
Figure 72: Stripping the Power Wires
122
Figure 73: Attaching the Power Wires to the Straight Terminal Lugs
122
Figure 74: Opening the Plastic Cover
123
Figure 75: Removing the Terminal Screws
124
Figure 76: Connecting the Positive (+) Power Wire with a Straight Terminal
125
Figure 77: Connecting the Negative (-) Power Wire with a Straight Terminal
126
Figure 78: Closing the Plastic Cover over the Terminal Connectors
127
Figure 79: Tightening the Handle Locking Screw
128
Connecting the DC Power Wires with the Right Angle Terminals
129
Figure 80: Attaching the Power Wires to the Right Angle Terminal Lugs
129
Figure 81: Removing the Plastic Cover
130
Figure 82: Removing the Terminal Screws
131
Figure 83: Connecting the Positive (+) Power Wire with a Right Angle Terminal
132
Figure 84: Connecting the Negative (-) Power Wire with a Right Angle Terminal
133
Figure 85: Tightening the Handle Locking Screw
134
Connecting Bare DC Power Wires
135
Figure 86: Stripping Solid or Stranded DC Power Wires
135
Figure 87: Connecting the Positive Wire with Bare Wire
136
Figure 88: Connecting the Negative Lead Wire with Bare Wire
137
Chapter 6: Configuring Switches for Stacking
139
Introduction
140
Command Summary
141
Stackport
141
Stack Enable
141
Stack Priority
141
Stack Renumber
142
Switch Provision
142
Powering on AT-Sbxpwrsys2 AC Power Supplies
144
Figure 89: Connecting the AC Power Cord
145
Figure 90: Securing the Power Cord with the Retaining Clip
145
Figure 91: Connecting the Power Cord to an AC Power Source
146
Starting a Local Management Session
147
Figure 92: Connecting the Management Cable to the Console RS-232 Port
148
Figure 93: User Exec Mode Prompt
149
Configuring the Master Switch
150
General Steps for the Master Switch
150
Configuring the Master Switch
151
Table 14: Configuring the Master Switch
151
Verifying the Master Switch
154
Table 15: Verifying the Master Switch
154
What to Do Next
155
Configuring Member Switches
156
General Steps for Member Switches
156
Configuring a Member Switch - Part I
157
Table 16: Configuring a Member Switch - Part I
157
Configuring a Member Switch - Part II
159
Verifying a Member Switch
161
Table 17: Configuring the Member Switch - Part II
161
Table 18: Verifying the Configuration of a Member Switch
161
What to Do Next
162
Powering on the Stack
164
Verifying the Stack
165
Figure 94: SHOW STACK Command
165
Chapter 7: Cabling AT-XEM2 Line Card Ports
167
Cabling 1Gbps and 10Gbps Ports on AT-XEM2-12XT Line Cards
168
Guidelines to Handling Twisted Pair or Fiber Optic Transceivers
169
Figure 95: Handle on 100Gbps Transceivers for the AT-XEM2-1CQ Line Card
169
Installing and Cabling Fiber Optic Transceivers
170
Table 19: AT-XEM2 Line Cards and Fiber Optic Transceivers
170
Figure 96: Installing an SFP Transceiver in the AT-XEM2-12XS Line Card
171
Figure 97: Installing a Fiber Optic Transceiver in the AT-XEM2-4QS Line Card
171
Figure 98: Installing an 100Gbps QSFP28 Transceiver in the AT-XEM2-1CQ Line Card
172
Installing Direct Connect Cables
173
Table 20: AT-XEM2 Line Cards and Direct Connect Cables
173
Figure 99: Installing AT-SP10TW Cables in the AT-XEM2-12XS Line Card
174
Figure 100: Sliding the AT-QSFPCU Cable into the Slot
174
Chapter 8: Replacing Modules
177
Replacing AT-Sbxpwrsys2 AC Power Supplies
178
Figure 101: Disconnecting the AC Power Cord from the Power Source
178
Figure 102: Disconnecting the AC Power Cord from the Chassis
179
Figure 103: Lifting the Locking Handle on the AT-Sbxpwrsys2 AC Power Supply
179
Figure 104: Removing the AT-Sbxpwrsys2 AC Power Supply
180
Replacing AT-Sbxpwrsys1-80 DC Power Supplies
181
Figure 105: Loosening the Screw on the Locking Handle
181
Figure 106: Opening the Plastic Window over the Terminal Block
182
Figure 107: Removing the Negative Lead Wire
183
Figure 108: Removing the Positive Lead Wire from the Terminal Block
184
Figure 109: Reinstalling the Screws on the Positive and Negative Terminals
185
Figure 110: Closing the Plastic Cover
186
Figure 111: Removing the Grounding Wire
187
Figure 112: Reinstalling the Nut and Washer on the Grounding Post
188
Figure 113: Lifting the Locking Handle and Removing the Power Supply
189
Figure 114: Installing the Blank Power Supply Slot Cover
190
Figure 115: Lowering the Locking Handle on the Power Supply Slot Cover
191
Replacing AT-XEM2 Line Cards
192
Table 21: Hot-Swapping Guidelines for XEM2 Line Cards
192
Figure 116: Loosening the Screws on the Ethernet Line Card
195
Figure 117: Disconnecting an Ethernet Line Card from the Chassis
196
Figure 118: Sliding an Ethernet Line Card from the Chassis
197
Figure 119: Placing the Ethernet Line Card in Its Anti-Static Bag
198
Replacing AT-FAN08 Modules
199
Removing AT-FAN08 Modules
199
Figure 120: Loosening the Screws on the AT-FAN08 Module
199
Installing AT-FAN08 Modules
200
Figure 121: Disconnecting the AT-FAN08 Module from the Chassis
200
Figure 122: Aligning the AT-FAN08 Module in the Chassis Slot
201
Figure 123: Seating the AT-FAN08 Module on the Connector in the Chassis
201
Figure 124: Tightening the Two Captive Screws on the AT-FAN08 Module
202
Chapter 9: Troubleshooting
203
Appendix A: Technical Specifications
209
Physical Specifications
210
Table 22: Product Dimensions
210
Table 23: Product Weights
210
Table 24: Ventilation Requirements
211
Environmental Specifications
212
Table 25: Environmental Specifications
212
Power Specifications
213
Table 26: AC Voltage and Frequency Requirements
213
Table 27: DC Voltage Requirements
213
Table 28: Maximum Power Consumption (Watts)
213
Table 29: Typical Power Savings in Eco-Friendly Mode (Watts)
213
Table 30: Maximum Power Supply Efficiency (Based on 100V Input Voltage)
214
Table 31: Heat Dissipation (British Thermal Units/Hour)
214
Certifications
215
Table 32: Product Certifications
215
Port Pinouts
216
Figure 125: Pin Layout (Front View) of the 1Gbps or 10Gbps Ports on the AT-XEM2-12XT Line Card
216
Table 33: Pin Signals for 1Gbps or 10Gbps
216
Table 34: RJ-45 Pin Signals for the Console Port on the Management Panel
217
Table 35: RJ-45 Pin Signals for 10 or 100Mbps for the NET MGMT Port on the Management Panel
217
Advertisement
Advertisement
Related Products
Allied Telesis AT-SBx908 Gen2
Allied Telesis AT-SBx8112
Allied Telesis AT-SBx81XS16
Allied Telesis AT-SBx81XLEM
Allied Telesis AT-SBx81XLEM/Q2
Allied Telesis AT-SBx81XLEM/XS8
Allied Telesis AT-SBxPWRSYS1
Allied Telesis AT-SBxPWRPOE1
Allied Telesis SwitchBlade AT-SB4104-80
Allied Telesis SwitchBlade AT-SB4108-00
Allied Telesis Categories
Switch
Network Router
Media Converter
Network Hardware
Wireless Access Point
More Allied Telesis Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL