Figure 58: Sliding The Pwr600 Dc Power Supply Into The Chassis - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Figure 58. Sliding the PWR600 DC Power Supply into the Chassis
4. When the power supply makes contact with the connector inside the
switch, gently press on its faceplate to seat it on the connector.
5. Visually inspect the power supply to be sure that its faceplate is flush
against the rear panel of the chassis.
6. If you purchased two DC power supplies for the switch, repeat this
procedure to install the second unit.
7. After installing the PWR600 DC power supply, go to the following
sections:
"Connecting the Grounding Wire" on page 123
"Connecting the DC Power Wires" on page 126
8. If you purchased an AC power supply as the second power supply, go
to "Installing PWR600 AC Power Supplies" on page 116.
9. To install an optional XEM2 Ethernet Line Card, go to "Installing an
Optional XEM2 Ethernet Line Card" on page 130.
10. After installing the power supplies and optional XEM2 Line Card, go to
one of the following chapters:
Chapter 6, "Installing the Switch on a Table" on page 135
x950 Series Installation Guide for VCStack
121