Figure 76. Tightening the Two Captive Screws on the Ethernet Line Card
7. After installing the power supplies and optional XEM2 Line Card, go to
one of the following chapters:
Chapter 6, "Installing the Switch on a Table" on page 135
Chapter 7, "Installing the Switch in an Equipment Rack" on page
139
Chapter 8, "Installing the Switch on a Wall" on page 147
Chapter 9, "Installing the Switch in the RKMT-SL01 Sliding Rack"
on page 163