Figure 117: Affixing The Warning Labels; Figure 118: Tightening The Two Screws On The Fixed Brackets - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Figure 117. Affixing the Warning Labels
3. Slide the switch fully into the rack.
4. Tighten the two screws on the fixed brackets to secure the switch to
the equipment rack. Refer to Figure 118.
Figure 118. Tightening the Two Screws on the Fixed Brackets
Warning
Always be sure to secure the switch to the outer rail (via the
adjustment bracket). If the switch is not secured properly, there is a
risk of it falling out during an earthquake.
Warning
Do not pull the switch out past the front rack posts.
x950 Series Installation Guide for VCStack
E68
E69
185

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents