Unpacking The Shipping Container; Figure 99: Shipping Container Contents - Allied Telesis x950 Series Installation Manual

Advanced layer 3+, alliedware plus v5.5.0-1
Hide thumbs Also See for x950 Series:
Table of Contents

Advertisement

Chapter 9: Installing the Switch in the RKMT-SL01 Sliding Rack

Unpacking the Shipping Container

Two outer rails - They attach to the
equipment rack. Their lengths are
adjustable from 600 to 960 mm
(23.6 - 37.8 in).
Two extension brackets - They set
the distance the switch is recessed
in the equipment rack and secure
the switch to the rack.
Two warning labels - They are
affixed to the top and bottom of the
switch and warn against pulling the
switch out past the equipment rack
posts.
172
The contents of the shipping container are shown in Figure 99.
Figure 99. Shipping Container Contents
Two inner rails - They attach to
the sides of the switch.
16 inner rail screws (M4 x 8
countersunk) - They attach the inner
rails to the switch. Screw holes and
number of screws vary depending on
the switch.
Four extension bracket screws (M3 x
4 countersunk) - They attach the
extension brackets to the inner rails.

Advertisement

Table of Contents
loading

This manual is also suitable for:

X950-28xsqX950-28xtqmX950-52xsq

Table of Contents