Removing And Restoring Power On The G700 Media Gateway - Avaya MCC1 Maintenance Procedures

Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

Additional maintenance procedures
Removing and restoring power
Figure 119: Setting the neon voltage
Removing and restoring power on the G700
Media Gateway
The G700 Media Gateway contains a detachable power cord. You can add power by plugging the power
cord into the G700 receptacle, then plugging the cord into the wall outlet.
You can remove power by properly powering down the S8300 (If the G700 is equipped with an S8300),
unplugging the power cord from the wall outlet, and then unplugging the power cord from the G700
receptacle.
NOTE:
The power supply in the G700 is not replaceable.
NOTE:
Auxiliary power is currently unavailable on the G700.
S8300 Media Server shutdown operations
Depending upon the circumstances of the replacement, different S8300 server shutdown operations may
be required:
1
If you are shutting down an active S8300 Media Server or a functional but inactive LSP, you can
use the Web interface to shut down the server:
a Under Server, click Shutdown This Server.
b On the Shutdown This Server screen, system restart checkboxes include:
396
Delayed (default option) – the system waits for processes to close files and other
clean-up activities to finish before the server is shut down
didmt1 KLC 053097
Maintenance Procedures
December 2003

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1Cmc1G600G650G350G700