Avaya MCC1 Maintenance Procedures page 326

Hide thumbs Also See for MCC1:
Table of Contents

Advertisement

4
Release the retaining tabs on the rails and slide the S8500 Media Server back into place on the
data rack.
5
Locate the marked cable that you removed from the old NIC and plug it into the Ethernet 2 port,
which is labeled ACT/LINK A on the small faceplate of the new NIC.
Powering up the server
Complete the following steps if you wish to start the media server at this time:
1
Plug the power cord into the power receptacle on back of the server.
2
Press the Power button located on the front right-hand side.
3
Login to the server after the startup to ensure that the installation is complete.
Checking LED activity on the dual NIC
When the Media Server is back in service, check the LEDs on each port of the dual NIC
S8500 rear panel dual NIC LEDs,
Figure 100: S8500 rear panel dual NIC LEDs
Figure notes
1
Network activity LED (Tx/Rx)
Confirming original Ethernet configuration
After the Media Server is back in service, check the original Ethernet configuration settings:
1
Go to the Configure Server Web page.
2
Confirm that the server's Ethernet configuration settings are the same as before.
326
on page 326).
PCI
1
100-127 -, 3,0A, 50/60 Hz
200-240 -, 1,5A, 50/60 Hz
PCI 2
133 MHz/64 Bit, 100 MHz/64 Bit
2
100-127 -, 3,0A,
200-240 -, 1,5A, 5
1
2
Connection rate:
LED is off: there is a 10 BASE-T active link.
LED is green: there is a 100 BASE-T active link.
LED is orange: there is a 1000 BASE-T active
link.
(Figure 100,
LINK TX/RX
LINK TX/RX
1
2
h3msble2 KLC 082503
Maintenance Procedures
December 2003

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Scc1Cmc1G600G650G350G700

Table of Contents