Fujitsu PRIMERGY RX2540 M2 Upgrade And Maintenance Manual page 80

Table of Contents

Advertisement

Basic hardware procedures
Figure 12: Securing power cord
Ê Pull the cable clamp up (1).
Ê Thread the power cord through the cable clamp (2).
Ê Press the cable clamp down until it engages to secure the cable (3).
I
It will take about 60 seconds until the server can be powered on.
80
Upgrade and Maintenance Manual
RX2540 M2

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents