Installing The New Capillary - Waters Xevo TQD Overview And Maintenance Manual

Hide thumbs Also See for Xevo TQD:
Table of Contents

Advertisement

4 Maintenance Procedures
7.
Use the 7-mm wrench to loosen the locknut.
8.
Unscrew the finger-tight PEEK union from the UNF coupling.
9.
Remove the ferrule from the capillary.
10. Remove the capillary from the UNF coupling.
11. Dispose of the capillary and ferrule in accordance with local
environmental regulations.

Installing the new capillary

Required materials
Chemical-resistant, powder-free gloves
Needle-nose pliers
7-mm wrench
Combined 2.5-mm Allen wrench and cone extraction tool
Red PEEK tubing
LC pump
HPLC-grade (or better) 1:1 acetonitrile/water
Capillary
Sharp knife or PEEK tubing cutter
Safety goggles
162
March 14, 2014, 715004387 Rev. B
Ferrule
To avoid spreading contamination, dispose of the
Warning:
capillary and ferrule in accordance with local environmental
regulations. The used components can be contaminated with
biohazardous or toxic materials.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents