Installing The New Capillary - Waters Xevo TQD Overview And Maintenance Manual

Hide thumbs Also See for Xevo TQD:
Table of Contents

Advertisement

12. Unscrew the finger-tight PEEK union from the UNF coupling.
13. Remove the ferrule and PTFE liner sleeve from the capillary.
14. Remove the capillary from the UNF coupling.
15. Dispose of the capillary, PTFE liner sleeve, and ferrule in accordance
with local environmental regulations.

Installing the new capillary

Required materials
Chemical-resistant, powder-free gloves
Combined 2.5-mm Allen wrench and cone extraction tool
10-mm wrench
Needle-nose pliers
LC pump
HPLC-grade (or better) 1:1 acetonitrile/water
Ferrule
Seal
PTFE liner tubing
Conductive sleeve
Red PEEK tubing
Sharp knife or PEEK tubing cutter
Metal gasket for the probe tip
Safety goggles
Ferrule
PTFE liner sleeve
To avoid spreading contamination, dispose of the
Warning:
capillary, PTFE liner sleeve, and ferrule in accordance with
local environmental regulations. The used components can
be contaminated with biohazardous or toxic materials.
Replacing the ESI probe sample capillary
March 14, 2014, 715004387 Rev. B
155

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents