Installing The Combined Appi/Apci Source - Waters Xevo TQD Overview And Maintenance Manual

Hide thumbs Also See for Xevo TQD:
Table of Contents

Advertisement

Installing the combined APPI/APCI source

Required material
Chemical-resistant, powder-free gloves
Warning:
toxic materials, and to avoid spreading contamination to
uncontaminated surfaces, wear clean, chemical-resistant,
powder-free gloves while performing this procedure. The source
components can be contaminated.
Warning:
prepare the instrument according to the procedure on
"Preparing the instrument for operations on or inside its
To install the combined APPI/APCI source:
1.
Prepare the instrument for working on the source (see
Warning:
with the probe and source; these components can be hot.
2.
Remove the probe from the currently installed source.
If you are removing an ESI probe, see
If you are removing an IonSABRE II probe, see
3.
Remove the existing source enclosure (see
4.
Install the combined APPI/APCI source enclosure (see
5.
Install the corona pin (see
6.
Connect the APPI drive cable to the instrument's front panel connector.
To avoid personal contamination with biohazards or
To avoid electric shock, before beginning this procedure,
To avoid burn injuries, take great care while working
page
93).
March 14, 2014, 715004387 Rev. B
Combined APPI/APCI source
page
page 88).
page
61.
page
65.
page
90).
page
92).
88,
source".
71

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents