Installing The New Capillary - Waters Xevo TQ-S Operator's, Overview And Maintenance Manual

Mass spectrometry system
Table of Contents

Advertisement

12. Unscrew the finger-tight PEEK union from the UNF coupling.
13. Remove the ferrule and PTFE liner sleeve from the capillary.
14. Remove the capillary from the UNF coupling.
15. Dispose of the capillary, PTFE liner sleeve, and ferrule in accordance
with local environmental regulations.

Installing the new capillary

Required materials
Chemical-resistant, powder-free gloves
Combined 2.5-mm Allen wrench and cone extraction tool
10-mm wrench
Needle-nose pliers
LC pump
HPLC-grade (or better) 1:1 acetonitrile/water
Capillary
Ferrule
Seal
PTFE liner tubing
Conductive sleeve
Red PEEK tubing
4-86
Maintenance Procedures
Ferrule
PTFE liner sleeve
The capillary, PTFE liner sleeve, and ferrule can
Warning:
be contaminated with biohazardous and/or toxic materials.
Dispose of them according to local environmental
regulations.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents