FusionModule800 Smart Small Data
Center
Quick Guide
Issue: 02
Date: 2021-02-05
HUAWEI TECHNOLOGIES CO., LTD.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionModule800

  • Page 1 FusionModule800 Smart Small Data Center Quick Guide Issue: 02 Date: 2021-02-05 HUAWEI TECHNOLOGIES CO., LTD.
  • Page 2 Condensate drain outlet: for draining condensate from the smart cooling product. Water port Humidifier water pipe port: Connects to external water pipes to supply water to the humidifier. Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved.
  • Page 3: Installation Scenarios

    Space requirements for the cold and hot aisle containment • The cabinet layout shown in the figure is for ease of description and does not provide reference for engineering layout. If the site conditions do not meet the space requirements, contact Huawei technical support. •...
  • Page 4: Hardware Installation

    Outdoor Unit Installation Scenario • If the outdoor unit is placed higher than the indoor unit, the maximum height deviation between them should be less than or equal to 30 meters. Install an oil trap every 5–6 meters in the vertical direction along the gas pipe. •...
  • Page 5 4. Remove the top plate. 5. Remove the air director. 6. Remove an aisle containment. 7. Reinstall all components. Adjusting the Positions of Aisle Side Sealing Plates 1. Remove the aisle side sealing plates 2. Install sealing plate fasteners for an end from the Converged Cabinet.
  • Page 6: Installing A Cabinet

    Installing a Cabinet 1. Determine the cabinet position based on the engineering layout diagram. 2. Place the end cabinet at the correct installation position. • Use a measuring tape to check that the 3. Level the cabinet using a wrench. vertical distance between the top of the 2000 4.
  • Page 7 (Optional) Install the eLight 1. Install the strip light. 2. Interconnect the terminals. (1)Strip light extension cable (2) ETH converter 3. Install the eLight actuator and power module. a. Open the rear door of the end cabinet. b. Align one end of the support with the notch on the rear door side of the top panel, and hook the other end of the support to the long strip hole on the top panel, as shown...
  • Page 8 (Optional) Install an Indoor Unit • This section applies to the scenario with three or four smart cooling products. The figures in this document use the third cooling product as an example. If the fourth cooling product is configured, refer to the installation method of the third cooling product. When the fourth cooling product is installed, the layout of the control units are different.
  • Page 9 4. Obtain transfer brackets from the fitting bag of the cabinet, and install them at the six positions shown in Figure (2). 5. Move the two front mounting bars on the front door side 75 mm towards the cabinet rear, and secure them to the transfer brackets.
  • Page 10 Installing Guide Rails at the Floating Nut Installation Positions Bottom of the IT Cabinet (for the Third Indoor Unit)
  • Page 11 Installing Floating Nuts (For the Third Indoor Unit) Installing the Guide Rails (For the Third Indoor Unit) (For the Third Indoor Unit) Securing the Indoor Unit Securing the Control Unit...
  • Page 12 (For the Fourth Indoor Unit) (For the Fourth Indoor Unit) Securing the Indoor Unit Securing the Control Unit • In the figure, (3) indicates the third indoor unit and control unit, and (4) indicates the fourth indoor unit and control unit. •...
  • Page 13 Installing an Outdoor Unit Outdoor Unit Installation Dimensions The methods for installing the NetCol500-A018, NetCol500-A020, and NetCol500-A021 are the same. The NetCol500-A018 is used as an example. NetCol500-A018 NetCol500-A020 Unit: mm (Front view) (Front view) (Top view) (Top view) NetCol500-A021 Unit: mm (Front view) (Top view)
  • Page 14 • indicates the wind direction. If the site installation environment is complicated and the preceding conditions are not met, • contact Huawei technical support. Space requirements for a single outdoor unit It is recommended that a single outdoor be installed against a wall.
  • Page 15 Space requirements for multiple outdoor units If an air baffle is needed, place the air baffle at the air intake side of each outdoor unit. Concrete base requirements Removing the Pallet Securing the Outdoor Unit...
  • Page 16 Installing the Refrigerant Pipes Laying Out Pipes 1. The height deviation refers to the distance from the stop valves of the indoor unit to the stop valves of the outdoor unit. is a sign of a tilt, and it indicates that the scale of the pipe tilt is at least 1:200. The pipe tilt direction should be consistent with the hypotenuse of the right triangle.
  • Page 17 (1) Oil trap (2) Tilted gas pipe (3) Indoor (4) Tilted liquid pipe unit 1. Keep at least 25 mm between pipes. 2. When connecting the indoor and outdoor units, you are advised to connect pipes to the outdoor unit first. Seal the pipe if the welding break will exceed 15 minutes to prevent dust and water from entering the pipe.
  • Page 18 2. Route pipes inside the cabinet. Downward pipe routing...
  • Page 19: Connecting The Indoor Unit

    1. Connect the liquid pipe stop valve first, and then the gas pipe stop valve. 2. Tighten the liquid pipe stop valve using a 27# torque wrench to a torque of 35–37 N· m. Tighten the gas pipe stop valve using a 36# torque wrench to a torque of 50–52 N· m 3.
  • Page 20 Installing Water Pipes Installing Water Inlet Pipes (1) Reserved connector (2) Active connector (3) Rigid pipe (4) Elbow (5) Rigid pipe Upward water inlet pipe routing Downward water inlet pipe routing After routing water pipes, secure them to the refrigerant pipes using cable ties. If the pipes are routed downwards, not only secure the pipes but also seal the cable hole using firestop putty.
  • Page 21 Installing a Drainpipe (1) Drainpipe connector: BSPT 1/2-inch, delivered with the smart cooling product (2) Rigid pipe conversion adapter: BSPP 1/2-inch inner screw thread to rigid pipe connector, engineering procurement (3) Rigid pipe: made of PP-R or other material, engineering procurement (4) Pagoda conversion adapter: BSPP 1/2-inch inner screw thread to pagoda connector, engineering procurement (5) Hose clamp, engineering procurement...
  • Page 22: Installing Cables

    Upward drainpipe routing Downward drainpipe routing IT cabinet Converged Cabinet IT cabinet Converged Cabinet After routing water pipes, secure them to the refrigerant pipes using cable ties. If the pipes are routed downwards, not only secure the pipes but also seal the cable hole using firestop putty. Installing Cables M3 (3 PCS) 0.6-0.8N•m...
  • Page 23 • Do not pull cables J1, J2, J3, and J4 and their terminals casually. Ensure that the cables are connected securely. • The length of the signal cable for the indoor and outdoor units cannot exceed 200 meters. • The signal cable should be shielded, and the shield layer should be grounded. No.
  • Page 24 Power and signal cable routing of the third Power and signal cable routing of the fourth indoor unit indoor unit Leakage Test with Nitrogen and Vacuumizing 1. The stop valves for the gas pipe and liquid pipe on the indoor unit side are open, and those on the outdoor unit side are closed.
  • Page 25 (L). L should be less than or equal to 80 meters. If L exceeds 80 meters, contact Huawei technical support.
  • Page 26: Installing Batteries

    Installing Power Supply and Distribution Devices 12.1 Installing Batteries 1. Install batteries. The battery appearance and layout Circuit shown in the figure are for reference breaker only. The actual battery appearance and battery wiring diagram prevail. 2. Connect battery cables. Short cable connection Battery Tray...
  • Page 27 Connecting cables (10 kVA UPS) Connecting cables (20 kVA UPS, not sharing battery strings) 2. Connect cables to MCCB 2. a. Remove the circuit breaker panel. 3. (Optional) If two battery strings are configured, b. Connect cables to battery terminals +, connect cables from the UPS terminals + and –...
  • Page 28: Installing A Battery Pack

    • If the 10 kVA UPS is configured, do not connect the N cable. • If two 10 kVA UPSs are configured, connect the cables of the first UPS to the circuit breaker on the left side and connect the cables of the second UPS to the circuit breaker on the right side. •...
  • Page 29 12.4 Installing a PDU2000 (Optional) Install a half-height PDU2000 Installing a PDU2000 (in the IT cabinet with the third or fourth smart cooling product) Installing a PDU2000 (in the Converged Cabinet BC1) (Optional) Install a horizontal PDU2000 (Optional) Install a non-intelligent (Optional) Install an intelligent full-height PDU2000 full-height PDU2000...
  • Page 30 12.5 Installing an ATS Subrack 1. Install guide rails. 2. Install the subrack. The ATS subrack needs to be installed at the 33–40 U position in the IT cabinet to the right of the Converged Cabinet. (Optional) Installing Cable Troughs 13.1 Removing a Binding Plate...
  • Page 31 13.2 Installing a 600 mm Wide Cable Trough Interconnecting lever 13.3 Installing an 800 mm Wide Cable Trough An 800 mm wide cable trough (BOM number: 21501140) is installed on the top of an 800 mm wide cabinet. It is installed in the same way as a 600 mm wide cable trough. Installing Monitoring Devices 14.1 Installing the SIM Card and Antenna...
  • Page 32 Installing a PAD 14.2 1. Adjust the PAD mounting bracket to match the PAD to be installed. 2. Remove the nut from the PAD mounting bracket and install the bracket. 3. Route the PAD power cable through the cable hole and connect the cable. 4.
  • Page 33 b. Remove the upper cover of the chassis. c. Install disk screws. d. Install the SATA cable and power cable. Ensure that the metallic plate of the SATA cable faces upward. e. Install a disk in the No. 1 position. (1)No.
  • Page 34 h. Install hard disk 0 in the same way. l. Secure the VCN510 to the 40–41 U position i. Reinstall the chassis cover and screws. in the cabinet. The location can be adjusted j. Install floating nuts. based on the actual situation. k.
  • Page 35 3. Set device addresses for the T/H sensors. • Toggles 1 to 6 of the DIP switch are used to set the device address, toggle 7 is reserved, and toggle 8 is used to switch the temperature display mode. • The device address is set in binary mode.
  • Page 36 4. Connect the communications cables to the T/H sensors. ECC800 T/H sensor 2 T/H sensor 1 Temperature sensor 14.6 Installing T/H Sensors (33010516) • The figure is for reference only. Install the devices based on site requirements. The NetCol remote T/H sensors are attached to the leftmost and rightmost IT cabinets near •...
  • Page 37 Installing two T/H sensors when two NetCols are configured A: Position for installing the T/H sensor for the NetCol at the bottom of the Converged Cabinet, 28 U B: Position for installing the T/H sensor for the NetCol on the top of the Converged Cabinet, 14 U Installing three T/H sensors when three NetCols are configured A: Position for installing the T/H sensor for the NetCol at the bottom of the Converged Cabinet, 28 U...
  • Page 38: Installing A Camera

    OFF ON OFF OFF • The default addresses of T/H sensors purchased from Huawei are 1. • After the addresses are set, set Cold-aisle sensor to Enable on the ECC800 WebUI. Otherwise, the T/H sensors will not work. Path: Monitoring > Cooling > NetCol5000-A1 >...
  • Page 39 (1) Lens adjustment pole 14.8 Installing a Smart ETH Gateway and an ETH Converter With M-shaped cable troughs Without M-shaped cable troughs (1) Smart ETH gateway Routing the Cable to a WLDS900 14.9 Water Sensor Do not contact the water detection cable to metal, for this action will cause a false alarm.
  • Page 40 14.10 Installing an Electrode Water Sensor 1. Place the water sensor on the floor under the Converged Cabinet. 2. Route the water sensor cable through the cable hole in the lower cover plate of the Converged Cabinet for the hot aisle. 3.
  • Page 41 14.12 (Optional) Installing an In-Room Double Door Magnetic Lock 1. Fold the cutout template 90 degrees, 2. Remove the hoisting strip. mark mounting holes, and drill holes. 4. Route cables and secure the magnetic lock. (1) Door (2) Cutout (3) Door 5.
  • Page 42 3. Secure the hoisting strip. 4. Remove the cover and route cables. Pay attention to the direction of the hoisting (1) Cable hole strip, and ensure that the bulging surface of the magnetic lock faces the magnet. 5. Secure the magnetic lock. 6.
  • Page 43 14.15 (Optional) Installing an In-Room Fingerprint and Card Reader 14.16 (Optional) Installing an In-Room Card Reader with a Keypad 14.17 (Optional) Installing an In-Room Exit Button 1. Remove the cover of the exit button. 2. Remove the base and mark mounting holes using the base and a marker. 3.
  • Page 44: System Cable Routing

    Cable Routing System Cable Routing (1) Power cable (2) Signal cable Smart ETH Gateway Cable Routing (1) Signal cable (2) Power cable...
  • Page 45: Power Cable Routing

    Power Cable Routing (1) PDU2000 power cables (2) Mains input power cables (3) Power cables from batteries to the UPS Smart Module Grounding (1) General ground bar...
  • Page 46 (Optional) Connecting Cables to the ATS Subrack Power cables of Output power input II to the ATS cables from the ATS to the Power cables of Converged input I to the ATS Cabinet Connect the ground cable first. Connecting Power Cables to the Converged Cabinet Top Cable Routing Connecting output power cables to the PDU (for the indoor and outdoor units of the...
  • Page 47 Latin America Connecting input power cables to the PDU Connecting output power cables to the PDU Bottom Cable Routing Connecting PDU2000 Power Cables Connecting Cables Between the Batteries and the UPS For details, see the manual delivered with the UPS.
  • Page 48 Management System Cable Connection Connecting Cabinet Electronic Clasp Lock Cables Connecting VCN Cables (1) Ground terminal (2) GE1 port (3) GE2 port (4) Power button (5) Power port 1. Connect one end of the ground cable to the grounding terminal of the device and the other end to the grounding point of the network cabinet.
  • Page 49 1. Connect the PWR_OUT port on the smart ETH gateway to the 53.5VDC_OUT1 or 53.5VDC_OUT2 port on the ECC800 using a power cable. 2. Connect the FE_2 port on the smart ETH gateway to the LAN_2/POE port on the ECC800 using a network cable.
  • Page 50: Verifying The Installation

    Connecting Signal Cables for the Intelligent PDU2000 (1) ETH converter (2) Smart ETH gateway Verifying the Installation Item Check That Check Result □ Passed Indoor fan The fan is secured. The fan has no foreign matter inside. □ Failed Wet film □...
  • Page 51: Power-On Commissioning

    Item Check That Check Result □ Passed All cable joints are secured properly, especially the cable joints □ Failed between network cables. □ Passed Exposed parts near the wiring terminals and lugs are wrapped in □ Failed PVC insulation tape or heat shrinking tubing. □...
  • Page 52 If the surge protection module indicator is green, the SPD is running properly. If the surge protection module indicator is red, the surge protection module is faulty and must be replaced immediately. 2. Switch on the power input circuit breaker outside the cabinet to power on the cabinet. If the green power indicator on the cabinet front panel lights up, the cabinet is powered on properly.
  • Page 53: Initial Configuration

    2. Commission the system after the smart cooling product has been preheated for 12 hours. Before starting the compressor, ensure that the electric heating belt of the crankcase have been preheated for more than 12 hours. Otherwise, the compressor will be damaged. Huawei will not be liable for any consequences.
  • Page 54: Commissioning Procedure

    12 hours. • Ensure that no combustion-supporting materials (air or additives) enter the air conditioning system during commissioning. Huawei shall not be liable for any risks and losses thus incurred. • The electric heater and humidifier cannot work at the same time.
  • Page 55 1. Log in to the WebUI of the ECC controller as admin and choose Monitoring > Cooling > NetCol5000- A1 to enter the settings page. 2. Click Controls > Control Information, choose Startup/Shutdown control > ON, and then click Submit. 3.
  • Page 56 If the R410A refrigerant is provided by Huawei, put the refrigerant cylinder upside down when charging in the refrigerant. If the refrigerant is not provided by Huawei, check with the refrigerant provider whether the cylinder has a siphon. If the cylinder has a siphon, stand the cylinder when charging in refrigerant.
  • Page 57 Record the values of Barcode and Verify Code in the displayed Startup Password dialog box. c) Within 24 hours, inform Huawei technical support of Barcode and Verify Code to obtain the password. After obtaining the password, enter the password in the Password text box and click Submit to complete the authentication of the startup password.
  • Page 58 Commissioning Sensors Item Check Method Normal Connection Status Smoke Simulate a smoky environment Smoke DI alarm is displayed on the active Detector under the smoke sensor. alarm screen of the app or on the WebUI. WLDS900 Immerse the water detection Leak DI alarm is generated on the active Water Sensor cable in water.
  • Page 59 Setting iBOX and iBAT Parameters 1. Choose Monitoring > Power Distribution > iBOX/CIM > Running Parameters. Parameter Description Remarks Set this parameter based on iBOX/CIM single battery Total number of batteries the battery parameter planned qty. monitored by the iBOX/CIM by the customer.
  • Page 60 Item Alarm Severity Selection Description If there is a critical alarm, the eLight strip light turns on Critical with a red light. Critical, Major If there are multiple alarms, the eLight strip light Critical, Major, Minor preferentially turns on with a light corresponding to the high-severity alarm.
  • Page 61 Cameras (SD Card Configured) Perform the following steps according to the IPC6325- WD-VR Configuration Guide 1. Log in to the Huawei IPC 1. Log in to the camera web page and enable ONVIF. WebUI. 2. Set the IP address for the IPC6325 camera.
  • Page 62 Small Data Center V100R001C20 User Manual 3.15 (Optional) Edge Data Center Management Solution For commissioning details, see the documentation for the edge data center management solution. Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...
  • Page 63 LAN_1/POE MON2 antenna 4G天线 WAN_1 AI/DI_1 Temperature ECC800 ECC800 温度传感器 AIDI_1 AIDI_2 COM1/AIDI_4 COM3/12V WAN1 LAN1/POE sensor (Front) (正面) HUAWEI WLAN MON1 RF_Z DO/12V AIDI_3 COM2/AIDI_5 COM4/CAN WAN2 LAN2/POE AI/DI_3 LAN_2/POE WiFi module WiFi模块 Second smart WiFi模块 智能温控产品2 cooling product...