personnel to keep the UPS key.
5.3
UPS Transportation
before shipment. Before unloading the UPS from the pallet, please use a #17 combination
wrench and a socket wrench to remove the eight bolts and eight screws from the eight
stands (see Figure 5-2). After that, use appropriate handling equipment (e.g. forklift) to
carefully move the UPS from its pallet to the ground.
UPS
5.4
Fixing the UPS
NOTE:
Please follow the steps below:
1
information, please refer to Table 5-1.
2
After the UPS is moved to the designated installation area, please check that the UPS
can stand on the ground stably and levelly without any tipping.
Modulon DPH Series
WARNING:
Do not use air conditioners or similar equipment to blow into the rear of the
UPS and hinder ventilation.
Bolt &
Screw × 8
(Figure 5-2: Location of the Stands, Bolts & Screws)
Please use appropriate equipment (e.g. forklift) to move the UPS.
Pallet
Stand × 8