Wiring; Pre-Wiring Warnings - Delta Modulon DPH Series User Manual

Three phase 200-600 kva
Hide thumbs Also See for Modulon DPH Series:
Table of Contents

Advertisement

5.5

Wiring

5.5.1 Pre-wiring Warnings

NOTE:
1. Before wiring, please ensure that you have followed 5.4 Fixing the UPS
2. Before wiring, please read 5.5 Wiring thoroughly.
3. Only authorized Delta engineers or service personnel can perform installation,
Before wiring or making any electrical connection, make sure that the power supplied to
The UPS is of top or bottom wiring. Please leave adequate space on the top or at the
bottom of the UPS to allow cable entry.
Check that the size, diameter, phase, polarity are correct for each cable that needs con-
necting to the UPS and external battery cabinet(s). Please refer to Table 5-2 for the
Input
Modulon DPH Series
wiring, panel & cover removal, maintenance and operation. If you want to
execute any action mentioned above by yourself, the action must be under the
supervision of authorized Delta engineers or service personnel.
NOTE:
Table 5-2 is based on (1) default input/ output voltage: 220V, (2) default battery
Q'ty: 40 PCS and (3) default charge current per power module: 5A. For other
relevant values.
UPS Capacity
Power Module Q'ty
Rated current at input
voltage 220V with
battery charging
Recommended cable
size (L1/ L2/ L3/ N)
Maximum cable size
(L1/ L2/ L3/ N)
Cable lug width
Screw size
Table 5-2, please contact Delta service personnel for
DPH 200 ~ 600kVA
200kVA/
300kVA/
200kW
300kW
4
6
340A
510A
2
95mm
150mm
× 2 PCS
× 2 PCS
2
300mm
300mm
× 3 PCS
× 3 PCS
50mm
50mm
M12
M12
5-6
400kVA/
500kVA/
400kW
500kW
8
10
680A
850A
2
2
240mm
185mm
× 2 PCS
× 3 PCS
2
2
300mm
300mm
× 3 PCS
× 3 PCS
50mm
50mm
M12
M12
600kVA/
600kW
12
1020A
2
2
185mm
× 3 PCS
2
2
300mm
× 3 PCS
50mm
M12

Advertisement

Table of Contents
loading

Table of Contents