Before Installation And Wiring; Installation Environment - Delta Modulon DPH Series User Manual

Three phase 200-600 kva
Hide thumbs Also See for Modulon DPH Series:
Table of Contents

Advertisement

5.1

Before Installation and Wiring

Please read this user manual thoroughly before installation, wiring and operation. Only
authorized Delta engineers or service personnel can perform installation, wiring, panel
& cover removal, maintenance and operation. If you want to execute any action men-
tioned above by yourself, the action must be under the supervision of authorized Delta
engineers or service personnel. If you use a forklift or other equipment to move the
The UPS must be connected with at least one external battery cabinet (user-supplied,
tery Cabinet Connection Warnings for relevant information.
In this user manual, the meaning of Q1, Q2, Q3, Q4 and Q5 represents the following.
5.2

Installation Environment

Install the UPS indoors. Do not place it outdoors.
Make sure that transportation routes (e.g. corridors, door gates, elevators, etc.) and
installation area can accommodate and bear the weight of the UPS, external battery
cabinet(s), and handling equipment. Please refer to Table 5-1
information.
Table 5-1: UPS Floor Weight Loading Table
Capacity
Module Q'ty
Weight
Floor Weight
Loading
Modulon DPH Series
Code
Q1
Q2
Q3
Q4
Q5
DPH Series UPS_ 200/ 300/ 400/ 500/ 600kVA
UPS Net Weight: 605kg (without power modules)
UPS Weight Loading: 458.3kg/m
UPS
200kVA/
200kW
Power
4
753kg
570.5kg/m
Input Switch
Bypass Switch
Manual Bypass Switch
Output Switch
External Battery Cabinet's Breaker
2
(without power modules)
300kVA/
400kVA/
300kW
400kW
6
828kg
902kg
2
2
627.3kg/m
683.3kg/m
5-2
Table 5-1.
5.6 External Bat-
Meaning
500kVA/
500kW
8
10
976kg
2
2
739.4kg/m
600kVA/
600kW
12
1050kg
2
795.5kg/m