Ups Transportation & Handling; Ups Installation - Delta Ultron HPH Series User Manual

Three phase 20/30/ 40/ 60 kva 208v
Hide thumbs Also See for Ultron HPH Series:
Table of Contents

Advertisement

5.3
UPS Transportation & Handling
There are four casters at the bottom of the UPS. Please pay attention to the movement of the
casters to avoid accidents when you move the UPS from its pallet. The casters are designed
to move on level ground. Do not move the UPS on an uneven surface. This might cause
damage to the casters or tip the UPS which could damage the unit. If you need to move the
UPS over a long distance, please use appropriate equipment like a forklift. Do not use the
UPS casters to move the unit over a long distance.
5.4

UPS Installation

To avoid tipping the UPS, please reinstall the balance supports that were removed from the
UPS during the unpacking process. Please follow the following steps.
1
After you decide the installation area, follow the mounting hole diagram below to drill
holes.
(Ø : 0.26 " (6.5 mm))
(Ø :0.47 " (12 mm))
2
Place the UPS over the drilled holes, use the levelers to stabilize the UPS on the ground
and use the M8 screws (that were removed from the UPS during the unpacking process)
Ultron HPH Series UPS
Balance
Supports
Casters
Mounting Hole
Mounting Hole
(Figure 5-1: Mounting Hole Diagram)
(Front)
22.1" (562 mm)
24.5" (622 mm)
(Rear)
23

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents