5.3

UPS Transportation

before shipment. Before unloading the UPS from the pallet, please use a #17 combination
wrench and a socket wrench to remove the eight bolts and eight screws from the eight
stands (see
carefully move the UPS from its pallet to the ground.
UPS
5.4

UPS Installation

NOTE:
Please use appropriate equipment (e.g. forklift) to move the UPS.
Please follow the steps below:
1
Before installing the UPS in a designated installation area, please double check
cabinet(s) and handling equipment (e.g. forklift) to avoid accidents. For UPS floor
weight loading information, please refer to
2
After the UPS is moved to the designated installation area, please check that the UPS
can stand on the ground stably and levelly without any tipping.
3
At the bottom of the UPS, there are eight stands, three at the front, three at the rear,
.
Modulon DPH Series
). After that, use appropriate handling equipment (e.g. forklift) to
Bolt &
Screw × 8
Pallet
Stand × 8
.
5-4

Advertisement