Installation; Installation Checklist - Agilent Technologies 6850 Series II User Information

Gas chromatograph
Hide thumbs Also See for 6850 Series II:
Table of Contents

Advertisement

Installation

Installation checklist

The table below summarizes the installation steps for your 6850 GC. See also
your Agilent 6850 installation poster.
Step
1.
2.
3.
4.
5.
6.
7.
8.
9.
10. For manual injection, prepare the checkout sample and start.
11. If available, prepare checkout sample and start.
12. Verify chromatographic peaks.
13. If available, plug in the control module.
* See
Released: March 2004
Remove protective caps from TCD and vents.
Connect all cables.
Remove plugs and install column (label to front).
If available, install cryo cooling coil. Bend bracket to secure coil.
If available, install your sampler and cable.
Remove caps and connect your gases. If valve installed, connect sample lines.
Set gas source pressures and check for leaks.
Turn on the GC. If available, connect cryo filter and coolant.*
Load CHECKOUT method and wait until "Ready..."
"Prepare the cryogenic oven cooling system" on page 247
6850 Series II GC User Information
Installation checklist
for more details.
Installation
page 244 of
256

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents