Preparing To Service The Gc; Opening The Oven - Agilent Technologies 6850 Series II User Information

Gas chromatograph
Hide thumbs Also See for 6850 Series II:
Table of Contents

Advertisement

3.
4.
5.

Preparing to service the GC

If you can edit setpoints using either a Control Module or a ChemStation/Cerity
Chemical, turn off the heated zones you will be working with and wait for them
to cool. If you cannot edit setpoints, load the SERVICE method.
The factory provides a default SERVICE method, which:
You can create a more elaborate SERVICE method if you wish using a Control
Module or a ChemStation/Cerity Chemical. See their documentation for more
detail.

Opening the oven

1.
Released: March 2004
Install the assembly onto the vise-held female fitting and tighten the nut
finger-tight.
Push the tube fully into the female fitting, then withdraw it approximately
1 to 2 mm.
While holding the tube in position, use a wrench to tighten the nut further:
an additional 3/4 turn for 1/8-inch tubing, or an additional 1-1/4 turn for
1/4-inch tubing.
Resets the oven setpoint to 35°C if greater than 35°C
Turns inlet, detector, and auxiliary heaters off
Turns cryogenic cooling off
Turns the carrier gas off
Turns the detector off
If an auto injector is present, lift it off its mounting post and place it on the
bench top or on the (optional) bracket that mounts on the side of the GC.
6850 Series II GC User Information
Routine Maintenance: General
Preparing to service the GC
page 104 of
256

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents