Installation; Introduction; Initial Inspection - Agilent Technologies 8511B Operating And Service Manual

Frequency converter test set
Table of Contents

Advertisement

3

Introduction

Initial Inspection

CAUTION
Table 3-1

Installation

This section explains how to install the test set. The topics covered include
initial inspection, environmental considerations, positioning and connecting
the test set for use, and packaging the instrument. Refer to the "Installation"
chapter of the 8510 manual for more complete system connection and
turn-on instructions.
Inspect the shipping container (including cushioning material) and its
contents for completeness and damage. If the shipping container is damaged
or defective, keep the shipping materials and notify both the carrier and the
nearest Agilent office. The Agilent office will arrange for repair or
replacement of the test set without waiting for settlement of the claim. If any
of the following accessories are not received with the test set, notify your
nearest Agilent office and the missing parts will be sent to you.
Assemblies in the test set are very sensitive to damage by static electricity.
They may or may not continue to function if subjected to an electrostatic
discharge (ESD). Their reliability will however, be impaired.
Always use an anti-static wrist strap when calibrating or verifying the test set
or using the test set to measure devices. Never touch the test port center
conductors. For more information on ESD, refer to
Information" on page 1-12
Contents of the 8511B Shipping Container
Item
Power Cord
Test set cable assembly
GPIB cable
Performance test software (CD-ROM) assembly
Agilent 8511B Operating and Service Manual
"Electrostatic Discharge
of this manual.
Part Number
8120-1348
08510-60102
8120-3445
08511-60024
08511-90073
Agilent 8511B Test Set Operating and Service Manual 3-1
Installation

Advertisement

Table of Contents
loading

Table of Contents