Agilent Technologies 6850 Series II User Information page 48

Gas chromatograph
Hide thumbs Also See for 6850 Series II:
Table of Contents

Advertisement

Installing packed metal columns
Before following this procedure, make sure an adapter or liner is installed (see
Table 15
"Installing ferrules on a metal column" on page
1.
2.
3.
4.
5.
Released: March 2004
on
page
44), if needed, and that your column is prepared (see
Insert the column into the adapter, detector, or inlet liner until it bottoms.
Tighten the nut finger tight.
Adapter
Prepared column
If you are installing a column directly into the detector fitting:
1/4-in. column: tighten an additional 3/4 turn with a 9/16-in. wrench
1/8-in. column: tighten an additional 1/4 turn with a 7/16-in. wrench
If you are installing a column onto an adapter:
Tighten the column nut using two wrenches in opposition, one on the
column nut and the other on the liner or adapter body. This prevents the
liner or adapter from rotating while you tighten the column nut.
1/4-in. column: tighten an additional 3/4 turn with a 9/16-in. wrench
1/8-in. column: tighten an additional 1/4 turn with a 7/16-in. wrench
Establish a flow of carrier gas through the inlet. Heat the oven, inlet, and
detector to operating temperatures. Allow them to cool, and then retighten
the fittings.
Condition the column, if needed. (See
page
26.)
6850 Series II GC User Information
Installing packed metal columns
44).
"Conditioning packed columns" on
Columns and Traps
page 48 of
256

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents