Agilent Technologies 6850 Series II User Information page 125

Gas chromatograph
Hide thumbs Also See for 6850 Series II:
Table of Contents

Advertisement

8.
Remove
9.
10. Lift the inlet flow module out and remove the manifold block fitting from
11. Remove the inlet flow module from the instrument.
To install the flow module
1.
2.
3.
4.
5.
6.
7.
Released: March 2004
Remove the three screws that hold the inlet flow module in the lid.
If your 6850 has a valve box installed, remove the valve box cover.
the front of the module.
Use a lint free cloth to clean the surface of the manifold fitting O-rings so
they will make a good compression seal.
Lower the inlet flow module into position and install the manifold block
fitting and O-rings.
Reconnect the module ribbon cable to the jumper cable.
Secure the inlet flow module in place by tightening the three screws.
Slide the cover plate in place and tighten the two mounting screws.
Reconnect the gas inlet fitting.
Check for leaks. See
refer to your G2629A Control Module documentation for an automatic
test.
6850 Series II GC User Information
"Leak testing the split/splitless inlet" on page 128
Routine Maintenance: Inlets
Maintaining a split/splitless inlet
Manifold block fitting
page 125 of
or
256

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents