09 - SQR484F EMISSION CONTROL SYSTEM
Installation
Installation is in the reverse order of removal.
CAUTION
Press PCV valve rubber boot into T-joint, then press in the PCV valve.
End surface of PCV valve larger diameter is flush with end surface of PCV valve rubber boot.
09
12
09–
Chery Automobile Co., Ltd.