Chevrolet Cruze 2012 Manual page 1551

Hide thumbs Also See for Cruze 2012:
Table of Contents

Advertisement

BACK TO CHAPTER INDEX
Heating, Ventilation and Air Conditioning
Callout
Preliminary Procedure
Remove IP Compartment. Refer to
Floor Air Outlet Duct Bolt
Caution:
1
Tighten
2.5 N·m (22 lbf in)
2
Floor Air Outlet Duct
Instrument Panel Compartment
Refer to
Fastener Caution
in the Preface section.
HVAC SYSTEM
Component Name
Replacement.
CHEVROLET CRUZE BODY REPAIR MANUAL 2010
S e c tion 10
TO MODEL INDEX

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents