30.11.2. Procedure of control completion

Completion of control realized in accordance with internal criteria may be
carried out in two ways:
• Automatically
All samples control – number of controlled samples accordant with
declared value in <Sample quantity> parameter. On completion of the
control a process summary is generated (see point 30.8 of this manual).
The control is automatically saved to database.
• Manually
Pressing beforehand defined key
key is pressed the following message is displayed.
Pressing
Pressing
in getting back to PGC mode setting window.
Caution:
Pattern and example of a report on control is described in point 30.14 of this
manual.
30.12. Simultaneous carrying out two control processes
The scale enables carrying out two control processes at the same time.
The option is enabled in:
• Go to local mode settings and set parameter <
of accessible controls> to value 2 (two controls),
key means getting back to the control in progress.
key means finish of the control. Finish of control results
(finish the control). When the