MSL Cable Termination

MSL Cable Termination
The following installation procedure describes how to install the wall installation cable kit
when the patient monitor and the measurement server are not located at the same site. The kit
consists of two connector boxes and a cable (15m or 25m).
For this procedure you need the Insertion Tool (M3086-43801) and a small screwdriver.
Step 1
NOTE
The installation procedure is the same for both connector boxes. This means you must
perform steps 3 to 8 of this procedure twice.
The connectors on each box are different, so you must ensure that the correct box is placed at
the correct location. The symbol on the plastic angled cover indicates at which site you
should install the box:
Symbol:
Symbol:
The correct connector cable (M3081-61601, M3081-61602 or M3081-61603) has the
opposite symbol:
Connector Box (in)
Connector Box (in)
At Monitor Site
At Monitor Site
If there are no symbols on the cover, dots are used:
Step 2
112
Draw the MSL cable through the wall from the site of the monitor to the site of the
measurement server.
Each MSL face plate kit contains two connector boxes; one in-going and one out-
going. (The US version contains an additional rectangular wall-mounting plate).
is connector box (in) and must be placed at the monitor site.
is connector box (out) and must be placed at the measurement server site.
Symbols on Cable
Symbols on Cable
•• ⇔ •• and • ⇔ •
Detach the PCB assembly (in/out) from the metallic mounting flange.
Cable
Cable
Connector
Connector
At Measurement Server Site
At Measurement Server Site
Connector Box (out)
Connector Box (out)
Installing the Instrument