Chapter 2—Daily Preparation for Treatment
To run the Pressure and Alarm tests:
1) From any
screen, select
Test & Options
2) From the
"Test & Options"
screen, select
Both Tests
3) Press
CONFIRM
Figure 24 – Starting Automatic Tests
Test Sequence
The automated test sequence consists of two distinct parts—Alarm tests and Pressure Holding
tests. The Pressure Holding Test, the Alarm test, or both tests can be started by selecting the
corresponding button on the "Test & Options" screen and pressing the CONFIRM key on
the Touchpad. After a long power down, however, only the Both Tests button is enabled.
56
2008T Machine Operator's Manual P/N 490122 Rev N