Testing The 2008T Hemodialysis Machine - Fresenius Medical Care 2008T Operator's Manual

Hemodialysis machine
Hide thumbs Also See for 2008T:
Table of Contents

Advertisement

Testing the 2008T Hemodialysis Machine

Before beginning treatment, the machine should undergo Pressure and Alarm tests to ensure
that it is functioning properly. Select the Both Tests button in the "Test & Options" screen to
start the test. The 2008T hemodialysis machine can be configured so that this testing is
mandatory after power up providing that the force test option is selected. In this case, the test
will start on its own.
To run the test sequence,
The dialyzer lines must be connected to the shunt with the interlock door closed.
The machine must be in an alarm-free condition by allowing sufficient time for the
dialysate to reach proper conductivity and temperature. This takes about five minutes
from the time the concentrate is confirmed on the dialysate screen (see Figure 21 on page
47).
Arterial and venous monitor lines must be clamped and removed from the pressure
monitor ports so the monitor ports are open to atmosphere.
UF and SVS must be off.
Warning! It is essential that the 2008T hemodialysis machine's balancing system is
operating properly. The machine must successfully complete a Pressure test before each
treatment, especially when using high-flux dialyzers.
2008T Machine Operator's Manual P/N 490122 Rev N
Chapter 2—Daily Preparation for Treatment
55

Advertisement

Table of Contents
loading

Table of Contents