Download Print this page

Mitsubishi Electric AJ65BT-D75P2-S3 User Manual page 473

Hide thumbs Also See for AJ65BT-D75P2-S3:

Advertisement

12
CONTROL AUXILIARY FUNCTIONS
Setting item
No. of pulses per
Pr.2
rotation
Movement
Pr.3
amount per
rotation
Pr.4
Unit magnification
* Refer to section "5.2 List of parameters" for setting details.
Calculation example
(Conditions)
Movement amount per pulse
No. of pulses per rotation
Unit magnification
(Positioning results)
Command movement amount
Actual movement amount
(Compensation amount)
5  10
AL'
3
=
AP'
12000
Movement amount per pulse
No. of pulses per rotation
Unit magnification
5)
Set the post-compensation " Pr.2
" Pr.3
Movement amount per rotation (Al')", and " Pr.4
magnification (Am')" in the parameters, and write them to the D75P2.
The set details are validated at the rising edge (OFF
remote station READY signal [RX(n+7)B].
Setting
value
A p '
Set the post-compensation value.
A l '
Set the post-compensation value.
A m '
Set the post-compensation value.
12 - 15
: 500 (  m/rev)
: 12000 (pulse/rev)
: 1
: 100mm
: 101mm
101  10
5050
101
3
=
=
101  10
12000
240
3
: 101 (  m/rev)
: 240 (pulse/rev)
: 1
No. of pulses per rotation (Ap')",
Setting details
MELSEC-A
Unit
ON) of the
Pre-compensation
value
Ap
Al
Am

Advertisement

loading