Download Print this page

Mitsubishi Electric AJ65BT-D75P2-S3 User Manual page 467

Hide thumbs Also See for AJ65BT-D75P2-S3:

Advertisement

12 CONTROL AUXILIARY FUNCTIONS
Lower limit
Zero point signal
Machine zero point
return start
(2) Setting range for the zero point shift amount
Set the zero point shift amount within the range from the detected zero point
signal to the upper/lower limit switches.
Setting range of the
negative zero point
Setting range of the positive zero point shift amount
shift amount
Address decrease
Address increase
direction
direction
Fig. 12.5 Setting range for the zero point shift amount
(3) Movement speed during zero point shift
When using the zero point shift function, the movement speed during the zero
point shift is set in " Pr.57 Speed designation during zero point shift". The
movement speed during the zero point shift is selected from either the " Pr.48
Zero point return speed" or the " Pr.49 Creep speed".
The following drawings show the movement speed during the zero point shift
when a machine zero point return is carried out by the near-point dog method.
(a) Zero point shift operation at the " Pr.48 Zero point return speed"
(When " Pr.57 Speed designation during zero point shift" is 0)
Pr. 46 Zero point
Pr. 48 Zero point
return direction
return speed
Near-point dog
Zero point signal
Fig. 12.6 Zero point shift operation at the zero point return speed
Near-point dog
Pr. 46 Zero point return direction
Zero point
When the " Pr. 55 Zero point
shift amount" is negative
12 - 9
MELSEC-A
Upper limit
When the " Pr. 55 Zero point
shift amount" is positive

Advertisement

loading