Download Print this page

Mitsubishi Electric AJ65BT-D75P2-S3 User Manual page 131

Hide thumbs Also See for AJ65BT-D75P2-S3:

Advertisement

4
INSTALLATION, WIRING AND MAINTENANCE OF THE PRODUCT
POINT
(1) The operation monitor described in this section is a function that allows the
D75P2 state, control state of each axis and state of the input/output signals to
be confirmed. This monitor can be operated at any time.
(2) If the D75P2 is not operating correctly, use the operation monitors as
necessary.
(3) As another display on the above 17-segment LED, if a watch dog timer error
occurs in the D75P2, "FALT" will appear.
If a watch dog timer error occurs in the D75P2, must be reset.
If the watch dog timer error still occurs in the D75P2 even after resetting the
D75P2 module must be replaced.
Contact your nearest dealer or sales office.
4 - 29
MELSEC-A

Advertisement

loading