Removing The Operator Information Panel Assembly - Lenovo HX3510-G Installation And Service Manual

Converged hx series server
Table of Contents

Advertisement

Snaps
Hooks
Figure 157. Hooks (the rear side of the media cage)
11. Rotate the media cage bezel and snap it into place.
1
Media cage bezel
Figure 158. Retention bracket installation
12. Install the media cage (see "Replacing the media cage (also called lightpath LCD operation panel
assembly)" on page 141).
13. Replace the top cover (see "Replacing the top cover" on page 118).
14. Slide the server into the rack.
15. Reconnect the power cords and any cables that you removed.
16. Turn on the peripheral devices and the server.

Removing the operator information panel assembly

Use this information to remove the operator information panel assembly.
To remove the operator information panel, complete the following steps.
Step 1.
Read the safety information that begins on "Safety" on page v and "Removing and replacing
guidelines" on page 101.
202
HX3510-G, HX5510, HX5510-C, HX7510 Installation and Service Guide
2
Media cage

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hx5510-cHx7510Hx5510

Table of Contents