LEGRAND D45 SYSTEM Installation Manual page 238

Audio & video door entry system
Table of Contents

Advertisement

Lift control interface
Wiring diagram
Wiring diagram example 2:
Building with 10 floors: floors 2 to 9 are PRIVATE floors and every floor has 4 apartments. Floor 1 is a PUBLIC floor with three entrance panels (EP address 3 to 5).
The underground floor (-1 floor) has two entrance panels (EP address 1 and 2). Delay time set as 20 sec. (CF7 = 2). This system needs N° 2 lift control interfaces.
1 2
323002
1 2
323002
IN
1 2
323002
OUT
1 2
323002
IN
1 2
323002
IN
OUT
323003
SUB SYSTEM
234
IU1
IU2
IU3
C
F
IU4
1
0 2 0 4 8 0 2 1
IU1
IU2
C
C
C
C
C
C
C
C
C
C
C
C
C
C
ISP
F
F
F
F
F
F
F
F
F
F
F
F
F
F
M
M
1
1
2
2
3
3
4
4
5
5
6
6
7
7
C F G
S1
S2
IU3
POWER L1
L2
POWER
OU TPU T1
IU4
SYST EM
SYSTEM
-
+
OUT
IN
IN
OUT
IU1
IU2
IU3
C
F
IU4
1
1 1 2 2 2 0 0 2
IU1
IU2
C
C
C
C
C
C
C
C
C
C
C
C
C
C
ISP
F
F
F
F
F
F
F
F
F
F
F
F
F
F
M
M
1
1
2
2
3
3
4
4
5
5
6
6
7
7
C F G
S1
S2
IU3
POWER L1
L2
POWER
OU TPU T1
IU4
SYST EM
SYSTEM
-
+
OUT
IN
IN
OUT
IU1
IU2
IU3
IU4
EP 5
EP 4
1 2 3 4
EP 3
323004
4
4
3
3
2
2
1
1
EP 2
EP 1
EP
EP OUT
BT00792-a-
C
C
C
C
C
C
F
F
F
F
F
F
M
OUTPUT8
2
3
4
5
6
7
OUTPUT7
OUTPUT6
OU TPU T8
OU TPU T7
OU TPU T6
OUTPUT5
323017
323017
OUTPUT4
OU TPU T2
OU TPU T3
OU TPU T4
OU TPU T5
OUTPUT3
OUTPUT2
OUTPUT1
C
C
C
C
C
C
F
F
F
F
F
F
M
OUTPUT8
2
3
4
5
6
7
OUTPUT7
OUTPUT6
OU TPU T8
OU TPU T7
OU TPU T6
OUTPUT5
323017
323017
OUTPUT4
OU TPU T2
OU TPU T3
OU TPU T4
OU TPU T5
OUTPUT3
OUTPUT2
OUTPUT1
EP3
OR
EP1
OR
en
25/11/2013
Down key of lift in 9 floor
Down key of lift in 8 floor
Down key of lift in 3 floor
Down key of lift in 2 floor
UP key of lift in 1 floor
UP key of lift in -1 floor
1 FLOOR
EP4
EP5
OR
OR
-1 FLOOR
EP2
OR
323017

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the D45 SYSTEM and is the answer not in the manual?

Questions and answers

Table of Contents

Save PDF