Figure 16 Setup - Control Path
Screen
Forcing CPF
Quantum Scalar i40 and Scalar i80 User's Guide
b For the appropriate partition, select the Requested Topology of
Point to Point from the drop down menu.
c Click Apply.
2 Select Setup > Control Path.
The Control Path screen displays for that partition.
3 Select the Failover drive by clicking the Failover option.
4 Click Apply.
You can also manually force a failover (see
Web Client
You can manually force a control path failover. You might want to force
a failover to check that the control path on the non-active tape drive is
operational, or to switch back to the original control path tape drive
once the issue that originally caused the failover has been fixed.
1 Click Tools > Drive Operations.
The Tools - Drive Operations screen displays.
Chapter 5: Advanced Reporting
Working with Control Path Failover (CPF)
Forcing CPF
on page 115).
115