Download Print this page

Toro Field Pro 6040 Service Manual page 91

Advertisement

Test Procedure (continued)
Field Pro® 6040
22267SL Rev A
15. Apply a load to the right side traction pump by slowly moving the right side
traction control lever in the F
1200 PSI) is reached on the flow meter pressure gauge.
16. Record the reading on the pressure gauge at the test fitting (not the pressure
gauge on the flow meter).
17. Release the traction control lever, move the throttle to low speed and set
the key switch to the O
18. Charge pressure (under load) should not drop more than 20% when
compared to charge pressure (without load) recorded in step 14.
If specifications are not met, leave the test equipment installed and perform
the piston (traction) Pump Flow and Relief Pressure Test as described in
Testing the Traction Circuit – Piston (traction) Pump Flow and Relief Pressure
(page
5–30).
19. After testing:
A. Remove the hydraulic tester and hoses then reconnect the hydraulic tube
to the traction pump and to the wheel motor.
B. Remove the pressure gauge and cover the test fitting with the cap
provided.
C. Check and adjust the level of the hydraulic fluid in the hydraulic reservoir;
refer to the traction unit Operator's Manual.
D. Start the engine and check for any hydraulic fluid leaks. Repair hydraulic
leaks if necessary before returning the machine to service.
direction until 6200 to 8275 kPa (900 to
ORWARD
position.
FF
Page 5–25
Hydraulic System: Testing the Hydraulic System

Advertisement

loading

This manual is also suitable for:

08839