Juniper MX240 Hardware Manual page 329

5g universal routing platform
Hide thumbs Also See for MX240:
Table of Contents

Advertisement

Copyright © 2019, Juniper Networks, Inc.
The green
LED should light steadily a few minutes after the Switch Control
OK/FAIL
Board is installed.
If the
OK/FAIL
LED is red, remove and install the Switch Control Board again. If the
LED still lights steadily, the Switch Control Board is not functioning properly.
OK/FAIL
Contact your customer support representative.
Check the status of the Switch Control Board using the
7.
command:
user@host> show chassis environment cb
CB 0 status:
State
Temperature
Power 1
1.2 V
1.5 V
1.8 V
2.5 V
3.3 V
5.0 V
12.0 V
1.25 V
3.3 V SM3
5 V RE
12 V RE
Power 2
11.3 V bias PEM
4.6 V bias MidPlane
11.3 V bias FPD
11.3 V bias POE 0
11.3 V bias POE 1
Bus Revision
FPGA Revision
CB 1 status:
State
Temperature
Power 1
1.2 V
1.5 V
1.8 V
2.5 V
3.3 V
5.0 V
12.0 V
1.25 V
3.3 V SM3
5 V RE
12 V RE
Power 2
11.3 V bias PEM
4.6 V bias MidPlane
11.3 V bias FPD
11.3 V bias POE 0
11.3 V bias POE 1
Bus Revision
FPGA Revision
Chapter 4: Maintaining, Installing and Replacing Components
show chassis environment cb
Online Master
25 degrees C / 77 degrees F
1198 mV
1508 mV
1830 mV
5059 mV
6593 mV
5111 mV
12181 mV
1250 mV
6587 mV
5078 mV
12026 mV
11253 mV
4827 mV
11408 mV
11446 mV
11408 mV
6
0
Online Standby
26 degrees C / 78 degrees F
1211 mV
1517 mV
1817 mV
2507 mV
3312 mV
5136 mV
12142 mV
1260 mV
3306 mV
5085 mV
11968 mV
11369 mV
4814 mV
11427 mV
11350 mV
11330 mV
39
1
329

Advertisement

Table of Contents
loading

Table of Contents