switch connector on the system board.
Cable
loops
4. Reinstall the fan cage assembly (see "Replacing the fan cage assembly" on page
332).
5. Install the cover (see "Replacing the server top cover" on page 265).
6. Slide the server into the rack.
7. Reconnect the power cords and any cables that you removed.
8. Turn on the peripheral devices and the server.
Scalability
Operator information
LED cable
panel cable
Chapter 5. Removing and replacing components
Top cover/
power
shut-off
switch cable
359