ZyXEL Communications GS1350 Series User Manual page 28

Gbe layer 2 poe switch
Hide thumbs Also See for GS1350 Series:
Table of Contents

Advertisement

1
Select a position free of obstructions on a wall strong enough to hold the weight of the Switch.
2
Mark two holes on the wall at the appropriate distance apart for the screws.
WARNING ! Be c a re ful to a vo id da m a g ing pipe s o r c a b le s lo c a te d inside
the wa ll whe n drilling ho le s fo r the sc re ws.
3
If using screw anchors, drill two holes for the screw anchors into the wall. Push the anchors into the full
depth of the holes, then insert the screws into the anchors. Do NOT insert the screws all the way in –
leave a small gap of about 0.5 cm.
If not using screw anchors, use a screwdriver to insert the screws into the wall. Do NOT insert the screws
all the way in
leave a gap of about 0.5 cm.
4
Make sure the screws are fastened well enough to hold the weight of the Switch with the connection
cables.
5
Align the holes on the back of the Switch with the screws on the wall. Hang the Switch on the screws.
Note: Make sure there is enough clearance between the wall and the Switch to allow
ventilation.
Chapter 2 Hardware Installation and Connection
GS1350 Series User's Guide
28

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs1350-6hpGs1350-12hpGs1350-18hpGs1350-26hp

Table of Contents