Procedures Before Operation - Mitsubishi MELSEC-Q Series User Manual

Positioning module with built-in counter function
Hide thumbs Also See for MELSEC-Q Series:
Table of Contents

Advertisement

5
PROCEDURES AND SETTINGS BEFORE
OPERATION
5.2

Procedures Before Operation

The following flowchart shows the procedures for operating the QD72P3C3.
Module installation
Install the QD72P3C3 in the specified slot.
Wiring
Wire external devices to the QD72P3C3.
(Refer to Section 5.4.)
Intelligent function module switch setting
Set the switches using GX Developer.
(Refer to Section 5.6.)
Connection check
Check connection using GX Developer or
GX Configurator-PT.
Drive unit operation check
Check operation using a simple program
in the factory-set status.
(Refer to Section 5.7.)
Use GX Configurator-PT?
Initial setting
Create a sequence program with initial
values using the FROM/TO instruction.
(Refer to CHAPTER 7.)
Programming and debugging
Create and check the sequence program.
(Refer to CHAPTER 7.)
System operation
Start
(Refer to Section 5.5.)
Yes
No
No
Initial setting
Make initial setting using
GX Configurator-PT.
(Refer to Section 6.6.)
Make auto refresh setting?
Yes
Auto refresh setting
Make auto refresh setting using
GX Configurator-PT.
(Refer to Section 6.5.)
5.2 Procedures Before Operation
1
2
3
4
5
6
7
8
5
- 3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec qd72p3c3

Table of Contents