2.2
Procedures before Operation
The flow chart below shows the N:N Network setting procedures up until data link:
1.
Check communication specifications
For communication specifications, link specifications, link pattern and number of link points, and link time, refer to Page
18 Specifications.
2.
System configuration and selection
For system configuration, and select communication equipment, refer to Page 17 System Configuration.
3.
Wiring
For wiring with twisted pair cable, and wiring example, refer to Page 21 Wiring.
4.
Communication settings
For communication settings of communication device, refer to Page 24 Communication Setting.
5.
Program creation
For communication test program, master station program, and slave station program, refer to Page 27 Programming.
*1 For more details about the connection and operation methods between the engineering tool (GX Works3) and PLC, refer to the manual
below.
GX Works3 Operating Manual
2.3
System Configuration
This section outlines the system configuration required to use the N:N Network.
You can use the N:N Network function in the CPU module using the built-in RS-485 port, communication board, and
communication adapter.
Allotment of serial ports is set to the following fixed numbers, regardless of system configuration.
■FX5U CPU module
CH4: Communication adapter-2
CH3: Communication adapter-1
CH1: Built-in RS-485 port
CH2: Communication board
*1
■FX5UC CPU module
CH4: Communication adapter-2
CH3: Communication adapter-1
CH1: Built-in RS-485 port
2.2 Procedures before Operation
2
2 N:N NETWORK
17