4 SETUP AND PROCEDURES BEFORE OPERATION

4 SETUP AND PROCEDURES BEFORE OPERATION
This chapter describes the procedures up to system startup using the QJ71DN91.
4.1 Setup and Procedures before Operation

4.1.1 When using the master function

Perform a hardware test (mode 9).
Yes
Create "parameters for the master
function" using GX Configurator-DN.
Set "auto communication start
settings" using GX Configurator-DN
and load it to the QJ71DN91.
Set "auto refresh" using GX
Configurator-DN and load it to the
QCPU.
Create a sequence program for
control.
Load the sequence program to the
PLC CPU and reset.
Trial run?
OK
It is necessary to install a DeviceNet network and turn ON the power in advance.
:
4 - 1
Start
Set to mode 0 to 2.
Use
No
GX Configurator-DN?
Create "parameters for the
master function" using a
sequence program.
Create a sequence program for "auto communication start
settings" and save it in the flash ROM of the QJ71DN91.
Load the sequence program to the
PLC CPU and reset.
NG
End
Create "parameters for the
master function" using auto
configuration. ( )
Create a sequence program
for refresh.
Create a sequence program
for control.
NG
Trial run?
OK
Save the parameters using a
sequence program (Y17).
MELSEC-Q
4
Creating the
parameters for the
master function
Setting the
presence of auto
communication
Setting refresh
4 - 1