Introduction; Installation Preparation - AGFA CR Series Service Manual

Digitizer
Table of Contents

Advertisement

DD+DIS155.11E
1

Introduction

IMPORTANT:
This document describes the installation and configuration of the digitizer including the
NX workstation with the help of the Quick Installation Guide (part of delivery) and the
CR 10-X / CR 12-X configuration wizard.
For installation without using the CR 10-X / CR 12-X configuration wizard refer to the
appendix, section 5.
REQUIRED TOOLS
The required tools are part of delivery.
REQUIRED TIME:
The complete installation of the digitizer including installation and configuration of the
workstation takes approximately 1 hour.
REQUIRED DOCUMENTS
Chapter 4 of the corresponding NX Workstation version in the Agfa HealthCare Library:
Computed Radiography > CR Workstation Software
NOTE:
The Installation Checklist in section 6 of this chapter gives an overview of all steps
of the digitizer installation and guides through the complete installation process.
2

Installation Preparation

Preparing the installation is split up into the following steps:
#
1
2
3
4
The controlled version of this document is available from the Agfa HealthCare Library. Any printed copy of this document is uncontrolled.
Edition 1, Revision 4
03-2013
Controls, Connections, and Setup Procedures
Task
Check the installation site prerequisites.
Unpack the digitizer.
Unpack the workstation and monitor.
Check the shipment completeness.
DOCUMENT CONTROL NOTE:
CR 10-X / CR Reader / CR 12-X / CR Advanced Reader
Type 5151 / 100 / 110 / 200 / 210
Section
2.1
2.2
2.3
2.4
Chapter 1 / Page 4 of 47
Agfa Company Confidential

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr 10-xCr readerCr 12-xCr advanced reader

Table of Contents