Starting Operation - Siemens SICAM Q100 7KG95 Series Manual

Class a power quality instrument and power monitoring device
Hide thumbs Also See for SICAM Q100 7KG95 Series:
Table of Contents

Advertisement

10 Operation at Use of the Display

10.2 Starting Operation

10.2
Starting Operation
Before starting the device, the following preconditions must be satisfied:
Mount the SICAM Q100 as described in chapter 7.2.
Connect the lines for measurement, communication and supply voltage as described in chapter 7.3 and
observe the safety provisions.
Switch on the devices needed for the measurement.
Switch on the supply voltage of the SICAM Q100.
Check whether the LEDs at the SICAM Q100 signal that the device is ready (see chapter 13.2).
The following picture is displayed while the device is being initialized after switching on the supply voltage:
Figure 10-1
Once the device has initialized, the currently selected screen with measured values is displayed.
NOTE
The following pictures only show the display without the front view of the device.
340
Start Screen
SICAM Q100, 7KG95xx, Device Manual
E50417-H1040-C522-A6, Edition 06.2019

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents