Chrysler PT Cruiser 2001 Service Manual Supplement page 2438

Table of Contents

Advertisement

23 - 6
STATIONARY GLASS
WINDSHIELD (Continued)
(10) Apply Glass Primer 25 mm (1 in.) wide
around perimeter of windshield. Allow at least three
minutes drying time.
(11) Apply a bead of urethane on windshield glass
as indicated (Fig. 5).
(12) With the aid of a helper, position the wind-
shield over the windshield opening and install encap-
sulation locator pin then load encapsulation hooks
onto the roof panel hooks.
(13) Push windshield into opening until no gap
encapsulation lays evenly along roof panel and there
is no gapping of encapsulation squeak tape to the
windshield opening
(14) Clean excess urethane from exterior with
Mopar, Super clean or equivalent.
(15) Apply
tape
to
required if gap exists around windshield opening.
(16) After urethane has cured, remove tape strips
and water test windhield to verify repair.
(17) Install cowl covers.
(18) Install inside rear view mirror.
(19) Allow urethane to cured for 10–12 hours.
Remove tape strips and water test windshield.
Fig. 2 WINDSHIELD INSTALLATION
1- WINDSHIELD ASSEMBLY WITH ENCAPSULATION
2 - ENCAPSULATION SQUEAK REDUCTION TAPE
3 - ANTI-SQUEAK LUBRICANT
2001 PT CRUISER
windshield
assembly
as
Fig. 3 WINDSHIELD SUPPORTS
1 - SUPPORT SPACERS ON ROOF PANEL (9mm X 20mm X
3mm)
2 - SUPPORT SPACERS ON COWL PANEL (9mm X 20mm X
6mm)
3 - ROOF PANEL HOOK
4 - ROOF PANEL SQUEAK REDUCTION TAPE
Fig. 4 WINDSHIELD LOADING
1 - ENCAPSULATION LOCATOR PIN
2 - ENCAPSULATION HOOK
PT

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents