Operation Flow After The Measurement Start Input Is Turned On - Sharp IV-C35M User Manual

Compact color image sensor camera
Hide thumbs Also See for IV-C35M:
Table of Contents

Advertisement

Setting and Operating Outline
1

[2] Operation flow after the measurement start input is turned ON.

Start (measurement start input ON)
Parallel output (Y0 to Y15), "READY" OFF
External interface inhibit
(keys, communications, parallel)
Measurement timer start
Reading the object type No.
Image capturing (camera 1/2)
No
No
Execute the light level
Executing measurement 0 using
Yes
Was an error detected?
Executing measurement 0 using
camera 2
Yes
Was an error detected?
2 (To the next page)
PC calculation
*1
Yes
READY ON
Is the light level
monitor selected?
Yes
monitor function
camera 1
No
No
1 (To the next page)
Capture the scan line range that was
specified when setting the
measurement conditions.
*1 The measurement start input is
set to "PARALLEL" and the
'READY' ON signal to "end of
image capture."
[Measurement program that is
selected]
- Positional deviation measurement
1-26

Advertisement

Table of Contents
loading

Table of Contents