Operation Flow After The Measurement Start Input Is Turned On - Sharp IV-S30J User Manual

Compact image sensor camera
Table of Contents

Advertisement

[2] Operation flow after the measurement start input is turned ON.

Start (measurement start input ON)
PC calculation
Parallel output (Y0 to Y15), "READY" OFF
External interface inhibit
(keys, communications, parallel)
Measurement timer start
Reading the object type No.
Image capturing (camera 1/2)
No
READY ON
No
Is the light level
monitor selected?
Execute the light level
monitor function
Executing measurement 0 using
camera 1
Yes
Was an error detected?
Executing measurement 0 using
camera 2
Yes
Was an error detected?
2 (To the next page)
*1
Yes
Yes
No
No
1 (To the next page)
1-19
Setting and Operating Outline
Capture the scan line range that was
specified when setting the
measurement conditions.
*1 The measurement start input is
set to "PARALLEL" and the
'READY' ON signal to "end of
image capture."
[Measurement program that is
selected]
- Positional deviation measurement
1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents