Throttle Body Construction - Suzuki AN400 Service Manual

Hide thumbs Also See for AN400:
Table of Contents

Advertisement

1D-12 Engine Mechanical:

Throttle Body Construction

1
1. ECT sensor
2. IAP sensor
3. ISC valve
4. Fuel injector
5. TP sensor
6. STP sensor
7. STVA
(a)
(b)
4
5
8. IAT sensor
"A": Triangle mark must point downward.
"B": Tighten the bracket with the cylinder head bolt (L130).
"C": Tighten each bolt in temporary and final stages in numerical order on bolt.
Refer to "Fuel Pump Disassembly and Assembly in Section 1G (Page1G-10)".
: 12 N⋅m (1.2 kgf-m, 8.5 lb-ft)
: 10 N⋅m (1.0 kgf-m, 7.0 lb-ft)
: 10 N⋅m (1.0 kgf-m, 7.0 lb-ft)
(c)
2
3
UPSIDE
LH
RH
UPSIDE
6
"A"
7
RH
8
"B"
B705H11406074
LH
FWD
"C"
RH
LH
I705H1140237-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents