Sub-Boards; Table 5 Indicator Working State Of Zxr10 2936-Fi; Table 6 Zxr10 2920/2928 Sub-Board List - Zte ZXR10 2900 Series User Manual

Intelligent
Table of Contents

Advertisement

ZXR10 2900 Series User Manual
18
Confidential and Proprietary Information of ZTE CORPORATION
status of port. The downside indicator shows the ACT status
of port.
16 indicators show the status of 8 10/100 BASE-T ports. Each
port has two indicators. The left indicator of port shows ACT
status. The right indicator of port shows LINK status.
Two system indicators show power indicator (SYS) and running
indicator (RUN).
Indicators running status are described as follows:
1. System indicators include power indicator (SYS) and running
indicator (RUN).
After the system is powered up, the SYS indicator is on and
the RUN indicator is off.
When BootROM starts to load the version, if the version is
unavailable, the states of indicators do not change. If the
version is loaded normally, the RUN indicator flashes at a
frequency of one time per second.
2. The indicators of ZXR10 2936-FI (except power and system
indicators) are shown in
T
5 I
ABLE
NDICATOR
Indicator
100BASE-FX/
1000BASE-X
Ports
10/100BA-
SE-TX Ports

Sub-boards

FGEI, FGFI, FGFE and FBFE can be chosen for ZXR10 2920/2928
according to the practical networking. The corresponding types
and functions are shown in
T
6 ZXR10 2920/2928 S
ABLE
Sub-board
FGEI
FGFI
Table
5.
W
S
ZXR10 2936-FI
ORKING
TATE OF
Position
State
The upside
LINK indicator
indicator
is on.
The downside
ACT indicator
indicator
is flashing.
On the left side
ACT indicator
of port
is flashing.
On the right
LINK indicator
side of port
is on.
Table
6.
-
L
UB
BOARD
IST
Model
RS-2800-2GE-RJ45
RS-2800-2GE-SFP
Meaning
LINK is
available.
Data is sent
and received.
Data is sent
and received.
LINK is
available.
Function
dual-channel 1000M
electrical ports
dual-channel 1000M
optical ports

Advertisement

Table of Contents
loading

Table of Contents