Front panel
Concluding steps
▶
"Installing a chassis foam" on page
▶
"Installing the air duct" on page
▶
"Reassembling" on page
▶
"Connecting the power cord" on page
▶
"Switching on the server" on page
▶ If applicable,
"Installing the front cover with lock" on page
▶
"Verifying system information backup or restore" on page
▶
"Resuming BitLocker functionality" on page
14.4
Front VGA
14.4.1
Installing the front VGA
Upgrade and Repair Unit
(URU)
Tools:
– Phillips PH2 / (+) No. 2 screw driver (for cover 2)
– hexagon screw driver 5 mm (for front VGA)
Preliminary steps
▶ If applicable,
"Removing the front cover with lock" on page
▶
"Shutting down the server" on page
▶
"Disconnecting the power cord" on page
▶
"Getting access to the component" on page
▶
"Removing the air duct" on page
330
72.
74.
57.
62.
66.
48.
73.
Upgrade and Maintenance Manual
66.
82.
93.
Hardware: 5 minutes
49.
52.
48.
RX2530 M6